Two GE TM 2500+ generation 8 gas turbines, 35 MW, 50 or 60 Hz, dual fuel, warranty, new condition, located in the
Two Pratt Mobilpac gas turbines, 25 MW, 50/60 Hz, dual fuel, full warranty, 4-5 month availability, new units, located in the
Two Frame 7 FA, 171 MW each, model 7241, gas fuel, 60 Hz, low nox, new condition, located in the
Three 22 MW LM 2500 gas turbines, low hours, 50 or 60 Hz, liquid fuel (dual fuel available), 90 day delivery, used condition, located in the
Two Siemens 701 DU gas turbines, 50 Hz, 125 MW, dual fuel, with warranty, can operate on HFO, rebuilt condition, located in Europe
Two Solar Centaur 50 gas turbines, 60 Hz, 4.0 MW, gas fuel, immediate availability, new units, located in the
Three Frame 9171 E gas turbines, 128 MW, 50 Hz, dual fuel, full warranty, new condition, located in Europe
Siemens SGT5-4000F gas turbine, 270 MW, 50 Hz, gas fuel, 11,000 volt, unused condition, located in Europe
LMS 100 gas turbine, 50 Hz, 100 MW, natural gas, 2016 standards, conversion to dual fuel and 60 Hz possible, warranty, new condition, located in the
Six SGT 100 zero hour rebuilt gas turbines, 5.25 MW, dual 50 or 60 Hz, dual fuel, warranty, rebuilt condition, located in Europe
Two Rolls Royce Trent 60 gas turbines, 66 Hz, 13,800 volt, dual fuel, warranty, new condition, located in the
Two Siemens SGT 800 gas turbines, 50 MW, 50 Hz, new with warranty, natural gas, located in Europe
Three GE Frame 6 B, 2012 year, 40 MW, 50 Hz, 11,500 kV, tri fuel (gas, distillate, crude), new condition, located in Europe
Two LM 6000 PC gas turbines, 2016 new, 48 MW, 60 Hz, 13,800 volt, natural gas, immediate availability, new condition, located in the
Solar Titan gas turbine, 2012 new and unused, 15 MW, natural gas fuel, 60 Hz, 6,900 volt, new condition, located in the
Frame 7 FA, 213 MW, natural gas, 60 Hz, 18,000 volt, 2013 year with warranty, new condition, located in the
LM 2500 gas turbine, 50 or 60 Hz, 22.8 MW, 1994 year, dual fuel, rebuilt with warranty, located in the
Two GE Frame 7 EA gas turbines, 85 MW, 60 Hz, dual liquid fuel, unused, 13.8 kV, 2008 year, located in the
Two Siemens SGT-800 gas turbines, 43 MW, 50 Hz, dual fuel, 101,000 hours, used condition, located in Europe
Three LM 2500 engines only, 26,600 HP, liquid fuel, in enclosures, 2,100 hours since full overhaul, used condition, located in Europe
Two Solar T 60 gas turbines, 5,670 kW, 60 Hz, 4,160 volt, dual fuel, 2013, new condition, located in the
LM 2500+ generator, 50 Hz, 31 MW, 2003 year, natural gas, 75,000 hours, used condition, located in Europe
Lycoming/Featherlite gas turbines, trailer mounted, 1.1 MW, 60 Hz, liquid fuel, 2015 year, new condition, located in the
Three Kongsberg/Viking gas turbines, 2,740 kW each, 50 Hz, dual fuel, never used, 1980, unused condition, located in Asia
Four Frame 5 N, 20 MW, 60 Hz, natural gas, low hours, used condition, located in the
Two Frame 6 gas turbines, 1996 year, 42 MW, 50 Hz, 11 kV, dual fuel, 90,000 hours, used condition, located in Asia
Combined Cycle Plants
Siemens SGT5-4000F combined cycle plant, 430 MW, 50 Hz, 11 kV, 2010 year, natural gas, 10,000 lifetime hours, used condition, located in Europe
9.2 MW CHP plant with two Solar Centaur gas turbines (3,800 kW each, 50 Hz, dual fuel) and 1,800 kW European steam turbine, complete, used condition, located in Europe
93 MW GE Frame 6 FA gas turbine plant, 88,000 hours, 50 Hz, natural gas, combined cycle, used condition, located in Europe
220 MW Frame 6 combined cycle power plant with four Frame 6 model 6541 gas turbines, GE 60 MW steam turbine, dual fuel, 50 Hz, 135,000 hours, used condition, located in Europe
Rolls Royce RB211 gas turbine combined cycle power plant with Allen STG, 32 MW, 50 Hz, 11 kV, 77,000 hours (7,000 since overhaul), dual fuel, 1998 year, used condition, located in Asia
Steam Turbines
49 MW Siemens SST 400 steam turbine, 60 Hz, 13,800 volt, never used, with warranty, new condition, located in the
36 MW coal or biomass plant with Sulzer boiler, Siemens and Kanis steam turbines, 50 Hz, 1982 with substantial refurbishment, used condition, located in Europe
10 MW coal/biomass power plant with two fluidized bed boilers, 16 MVA steam turbine, complete plant with all auxiliaries, latest technology, 50 or 60 Hz, new condition, located in Europe
25 MW ABB steam turbine, model GTL1050 EA, 60 Hz, 13.8 kV, 1989 year, low hours, used condition, located in the
45 MW Ansaldo non-condensing steam turbine, 60 Hz, overhauled, less than 50,000 hours, used condition, located in the
7.9 MW Shin Nippon condensing extraction steam turbine, 50 Hz, 6,600 V, immediate availability, 47,000 hours, used condition, located in Asia
58 MW Alstom back pressure steam turbine, 100,000 hours, 2000 year, 50 Hz, used condition, located in Europe
13 MW AEG condensing extraction steam turbine, 50 Hz, 1985, 70 hours of actual use, used condition, located in Europe
Request a Quote
✓
Request sent
Thank you, our team will reply to you shortly.
Direct access to our team
Email American Plant & Equipment
Tell us what you want to buy, source, finance, or sell. A machinery specialist will follow up with you.
✓
Thank you. Your request is with the American Plant and Equipment team.
A machinery specialist will follow up with you.
Machinery updates
Subscribe to our email list
Tell us which industries you follow and we will send you the machines that match.
✓
You are on the list.
We will email you when machines that match your interests come in. Unsubscribe from any message.