Description Overview All turbines and their auxiliaries are mounted on a single floating barge Required amount of natural gas: 1 mmscmd (approx.) Total fresh water requirement: 1000 cubic meter per day (approx.) Gas Turbines 4 x GE LM-6000 PC sprint aero derivative gas turbines 50.8 MW each Hours: 26,388 / 33,144 / 36,916 / 33,956 Steam System 4 x ABB steam generators 1 x IST steam turbine and generator 53 MW Chiller For cooling the gas turbine intake air for increasing the output Capacity: 1210 TR Refrigerant: HFC134a Compressed Air System 3 x 100% screw type air compressors with 2 x 100% dessicant type dryers Capacity: 12.7 Nm3 per minute and 8.64 bar g discharge pressure Electrical System Generated at 11 kV and evacuated as 220 kV 2 x step-up transformers 11 kV / 220 kV (1 each for 2 gas turbines) and 1 step-up transformer for steam turbine 2 x auxiliary transformers for stepping down from 11 kV to 6.6 kV 4 x step-down transformers for stepping down the 6.6 kV to 415 V Demineralization Plant Produces de-mineralized water for generating system in OTSG Water Cooling System Quantity: 1