Datgen, DR Series, Coffee Roasters, 0.1 to 37.5 kg Capacity, Propane or Natural Gas (New)

Description

  1. Overview
    1. All roasters are built with Dungs combustion controls, Siemens motors, and Artisan software.
    2. Optional features include automatic filling and unloading, flame intensity control manual, 2 year warranty, 24/7 worldwide customer service, and tech support.
  2. Model 3
    1. Capacity: 0.1 kg to 2.5 kg.
    2. Hourly roast output: 10 kg.
    3. Voltage: 230 volts @ 60 Hz or 400 volts @ 50 Hz.
    4. 40,000 btu, 26.2 kw.
    5. Fuel: propane or natural gas.
    6. Roaster weight: 100 kg.
    7. Roaster dimensions: 1400 mm tall x 1200 mm long x 1100 mm wide.
    8. Exhaust pipe diameter: 130 mm.
    9. Computer connection: RS 485.
    10. Drive: 4 motors.
    11. Motor power: 1 kw per hour.
  3. Model 5
    1. Capacity: 0.5 kg to 5 kg.
    2. Hourly roast output: 15 kg.
    3. Voltage: 230 volts @ 60 Hz or 400 volts @ 50 Hz.
    4. 90,000 btu, 26.2 kw.
    5. Fuel: propane or natural gas.
    6. Roaster weight: 300 kg.
    7. Dimensions: 1470 mm tall x 1750 mm long x 1140 mm wide.
    8. Exhaust pipe diameter: 150 mm.
    9. Drive: 4 motors.
    10. Motor power: 2 kw per hour.
  4. Model 12
    1. Capacity: 0.5 to 12 kg per batch (max 15 kg of green beans).
    2. Operating time: 5 to 18 minutes per batch, depending on roasting profiles.
    3. Roaster dimensions: 1160 mm wide x 1430 mm long x 1800 mm tall.
    4. Weight: 410 kg.
    5. Power: 230 volts @ 60 Hz or 400 volts @ 50 Hz.
    6. Fuel: propane or natural gas.
    7. Gas pressure: natural gas above 2 kpa / propane above 2.9 kpa.
    8. 90,000 btu per hour.
    9. Exhaust pipe diameter: 150 mm.
    10. Roast air scfm/scmh: 380 scfm / 650 scmh.
    11. Dr-12 is available in inventory.
  5. Model 30
    1. Capacity: 2.5 to 37.5 kg.
    2. The dr30 should take 8 weeks to have it ready, and 1 to 2 weeks to have it shipped to the customer’s warehouse.
  6. Model 60
    1. Capacity: 2.5 to 75 kg.
    2. The dr60 should take 8 weeks to have it ready, and 1 to 2 weeks to have it shipped to the customer’s warehouse.
  7. Shipping
    1. Shipping is paid by the owner.