Siemens, SGT-800, Combined Cycle Power Plant, 120 MW, 2x SGT-800 Gas Turbines, 1x SST-400 Steam Turbine

Description

  1. Overview
    1. Gas turbine, 2 sets, Siemens
    2. Gas equipment set, Siemens
    3. Steam turbine, 1 set, Siemens
    4. Steam boiler pk-83, 2 sets, Podolsky Mashinostroitelny Zavod (ZIO)
  2. Gas Turbine Scope Of Supply
    1. 2x SGT-800 - 44.1 MW
    2. 2x generator – AMS1250ALF (ABB)
    3. Full set of auxiliary equipment (reducing gear, oil systems, control and safety systems, etc.)
  3. Gas Equipment Set Scope Of Supply
    1. 3x booster compressors ELT 321/1400 (screw type) (Eltacon)
    2. 1x fuel gas treatment unit
    3. Full set of auxiliary equipment (control and safety systems, etc.)
  4. Steam Turbine Scope Of Supply
    1. 1x steam turbine SST-400 - 37.84 MW
    2. 1x generator – AMS1250LG (ABB)
    3. Full set of auxiliary equipment (oil systems, condenser, heat exchanger, condensate pumps, control and safety systems, etc.)
  5. Condition And Storage
    1. Gas turbines – on foundation
    2. Generators, auxiliary equipment – on open and close secured storage plots (according to producer’s storage requirements)
    3. Fuel gas compressors and treatment unit – in containers on open secured storage plots (according to producer’s storage requirements)
    4. Steam turbine, generator, auxiliary equipment – on open and close secured storage plots (according to producer’s storage requirements)
    5. Steam boilers frames – installed
    6. The remaining part of boilers equipment – on open and close secured storage plots