Description Overview Gas turbine, 2 sets, Siemens Gas equipment set, Siemens Steam turbine, 1 set, Siemens Steam boiler pk-83, 2 sets, Podolsky Mashinostroitelny Zavod (ZIO) Gas Turbine Scope Of Supply 2x SGT-800 - 44.1 MW 2x generator – AMS1250ALF (ABB) Full set of auxiliary equipment (reducing gear, oil systems, control and safety systems, etc.) Gas Equipment Set Scope Of Supply 3x booster compressors ELT 321/1400 (screw type) (Eltacon) 1x fuel gas treatment unit Full set of auxiliary equipment (control and safety systems, etc.) Steam Turbine Scope Of Supply 1x steam turbine SST-400 - 37.84 MW 1x generator – AMS1250LG (ABB) Full set of auxiliary equipment (oil systems, condenser, heat exchanger, condensate pumps, control and safety systems, etc.) Condition And Storage Gas turbines – on foundation Generators, auxiliary equipment – on open and close secured storage plots (according to producer’s storage requirements) Fuel gas compressors and treatment unit – in containers on open secured storage plots (according to producer’s storage requirements) Steam turbine, generator, auxiliary equipment – on open and close secured storage plots (according to producer’s storage requirements) Steam boilers frames – installed The remaining part of boilers equipment – on open and close secured storage plots