Collombey Oil Refinery, 486,000 m3 Total Capacity, 54 Tanks, 340 km Pipeline

Description

  1. Overview
    1. Supply pipe line is 340 km long, nitrogen purged
    2. Tank farm is included with 54 tanks
    3. Total capacity of the tank farm is 486,000 cubic meters
  2. Crude Oil Storage
    1. 5 tanks with floating roofs for crude oil storage, capacity 35,000 cubic meters each
  3. Kerosene Storage
    1. 21 tanks with floating roofs for storage of species of kerosene, capacities 1000, 1500, 30000, 3500, 6000, 7500 cubic meters
  4. Heavy Products Storage
    1. 28 tanks with fixed roof for storage of heavy products, capacities 1500, 5000, 10,000, 30,000 cubic meters each