Atmospheric Crude Unit, 20,000 BPD, Topping Unit, 30 to 45 API Crude Oil (New)

Description

  1. Overview
    1. This is for the atmospheric tower only, reformer is offered separately.
    2. Designed to operate at either 10,000 or 20,000 BPD.
    3. All auxiliary equipment is designed to produce 2 x 10,000 BPD.
  2. 1. Scope of Supply
    1. A) 20,000 BPD topping unit.
    2. B) Complete engineering and design package consisting of (1) Schedule A process engineering package.
    3. C) Procurement and supply of all equipment and materials needed for construction of the process unit needed for the process plant.
    4. D) Export packing and shipment.
    5. E) Documentation. Two sets of operation and maintenance manuals, spare parts list, design and technical vendor’s manuals in English will be provided.
  3. (1) Schedule A Process Engineering Package
    1. Process engineering.
    2. Civil work needed for the site. Buyer will provide the geotechnical information.
    3. Concrete/foundation engineering, calculations and drawings.
    4. Piping engineering (for the process plant only). Isometric drawings needed for pipe fabrication.
    5. Electrical and instrumentation.
    6. Mechanical engineering.
    7. Structural engineering.
    8. Insulation and fire proofing.
    9. DCS controls philosophy and design.
    10. Equipment list and specification.
    11. Motor list.
    12. Instrument index.
    13. Utility requirements.
    14. Flare calculations and design.
  4. Services Available at Additional Cost
    1. F) Construction & construction supervision will be provided for additional cost, if needed by buyer.
    2. G) Commissioning and start-up assistance at additional cost, if needed by buyer.
    3. H) Operating services for additional cost, if needed by buyer.
  5. 2. Exclusions (Items Not Supplied)
    1. A) Transportation from Houston to project site.
    2. B) Import permit, licenses, duties and taxes, etc.
    3. C) Land.
    4. D) Permits.
    5. E) Construction and construction materials.
    6. F) Structural and pipe fabrication.
  6. G) Excluded Off-Site (OSBL) Items
    1. Utility supply (power, water, natural gas) to the site.
    2. Tank farm for storing crude, products, water and other chemicals.
    3. Crude receipt and product shipping system.
    4. Fire protection system.
    5. Buildings (control room, ware house, maintenance shop, office building, change room).
    6. Security fencing.
    7. Water softener.
    8. Steam (if required).
    9. Nitrogen supply.
    10. Lighting.
    11. Roads.
    12. Oil water separator.
  7. Additional Information
    1. More information is available upon request.