Boralex, 24MW, 1985, Biomass Power Plant, 150000 lb/hr Steam Flow, 900 psi

Description

  1. Overview
    1. Sherman Boralex 24mw biomass facility
    2. Complete turnkey
    3. Year of manufacture: 1985
    4. Operational in 1986
    5. Shut down in 2009
  2. Specifications
    1. Zurn boiler
    2. Dresser Turbodyne condensing steam turbine
    3. Electric Machine generator
    4. Burns wood logs, chips, bark wet or dry
  3. Condition
    1. Ready to operate
    2. Can be relocated to a site location for power generation