Pub Brewery, 20 hl, 1994, 5 CCTs 40 hl, 6 Dispensing Tanks 10 hl

Description

  1. Overview
    1. Tower brewhouse for 20 hl per brew, complete in stainless steel, built 1994, steam heated, isolated and covered with stainless steel sheet, with 2 crane eyelets and 2 stainless steel platforms
    2. Room height in brewhouse and CCTs is 4.50 m
    3. Plant as assembled on 10.75 x 4.38 m
  2. Malt Handling
    1. Malt conveyors / spiral conveyor into 1st floor
    2. 2-roller malt mill
    3. Grist case
    4. Fall pipe in mash copper (for dust free mashing-in)
    5. Gibbet-lift for bagged special malts
  3. Brewhouse
    1. Mash- / wort copper with bottom heating zone and interior cooker, sideways agitator, manway entrance hatch, lighting, steam regulation valve
    2. Lauter tun with stainless steel raking machine with sew-drive from top, with spent grains slider, stainless steel false bottom, spent grains hatch, vertical sight glass, lighting, spray head, dome lid with built in control cabinet
    3. Spindle station with washing table in stainless steel, about 1.5 m wall assembled
    4. Hot water tank with 30 hl, in stainless steel, isolated and covered with stainless steel sheet, heatable, with manway in the wall, level display
    5. Pressure raising pump
    6. Wort cooling, 1-stage plate apparatus
    7. Wort aeration in stainless steel
  4. Fermenting and Storage Tanks
    1. 5 CCTs with 40 hl net / 46 hl gross content, all tanks 3 bar, built 1994, standing on feet, PI-isolated fully welded with stainless steel jacket, with jacket cooling from cone below to ½ wall 60 lt cooling jacket 3 bar, with manway in the wall, 2 outlets with butterfly valves, temperature sensor PT100, spray head, pulled down cleaning pipe with butterfly valve, bunging armature, over pressure valve, sampler, 2 crane eyelets, 2 of the tanks with level display
    2. Digital temperature control for 5 tanks in stainless steel control cabinet
    3. Many good beer hoses
    4. 6 x 10 hl beer dispensing tanks, make Duo Tank, built 2002, 3.0 / 4.3 bar, coolable, isolated with stainless steel jacket fully welded, for inline-operation, lying in rack, screwed stainless steel rack, with pressure armature, outlet armature with reduction to bare connection, manway with big sight glass in manway LED
    5. Panel for 3 types of beer
  5. Filling
    1. Combined bottle- / kegging plant with 1 cleaning tub, heated and 1 rebuilt keg
    2. Bottle cleaning machine for cleaning of 8 bottles inside and outside, for up to 2 lt bottles
    3. Bottle filling station with hub cylinder from below, with splinter protection
    4. Combined keg-cleaning and filling station
    5. Built in control cabinet with Siemens S5 control and operating console OP 7
  6. Other Equipment
    1. Steam boiler for about F280 kg/h, with gas burner, fully serviced on 4th August 2014, built in 1994
    2. Condensate tub in stainless steel at wall and second small S/S tub
    3. Water treatment
    4. Steam regulation and condensate valves in cycle
    5. Stainless steel chimney plant about 8-10 m
    6. Air compressor with wind kettle, built 1994
    7. Cooling plant / cold water plant, make L&R Kältetechnik, type WRK-17/SL/-5, plant built 1997, cooling agent R 407 C, with new compressor and new plate heat exchanger in 2014 for 10,000 € invested, evaporator with 2 ventilator outside hanging on the wall
  7. Additional Items
    1. About 100 kegs, make Schäfer, plus-kegs, flat fitting in different sizes, neutral
    2. Party-kegs with Bavarian tap, PU-covered in black and with wood-optic
    3. About 800 neutral clip lock bottles each 1 lt