Description Overview 9.2 mw gas turbine power plant Includes 2 x solar centaur gas turbine packages, whr boiler, steam turbine Gas Turbine 1 Type: Centaur 50 T 5701 Operating hours complete: 26,000 Turbine exchange in: 2005 Year of construction: 04/1997 Generator voltage: 10 kV Electric power: 3.7 mwel Gas pressure: 12.8 bar Control system: TTS1 Fuel: natural gas and light diesel Alternator: AVK / 6 kV Generator voltage: 10 kV Dimensions sound enclosure: 10,000 length, 3,250 width, 3,150 height Gas Turbine 2 Type: Centaur 50 T 5701 Operating hours complete: 2,500 Turbine exchange in: 2008 Year of construction: 04/1997 Generator voltage: 10 kV Electric power: 3.7 mwel Gas pressure: 12.8 bar Control system: TTS3 Fuel: natural gas and light diesel Alternator: AVK / 6 kV Generator voltage: 10 kV Dimensions sound enclosure: 10,000 length, 3,250 width, 3,150 height Scope Of Supply 2 gas turbine packages Heat recovery boiler attached to each gas turbine: type Bertsch, 8 t/h, 27 bar, 430°C, 130°C, add. firing, dual fuel Steam turbine 1.9 mw electric: KKK, 27 bar, back pressure 1.5 bar, including heat exchangers, back coolers, water preparation plant Condition Plant is in excellent condition Inspection possible at any time