Description Overview Three lines of polyester chips and flakes making lines Korean manufactured Year: 2003 Electric motor: 160 kW per machine Capacity: 1000 kg per hour per machine, total 3 machines (24 tons per 24 hours total 3 machines) Masterbatch Production Line One line with two extrusions Year: 2008 Capacity: 300 kg per hour One line of masterbatch laboratory for sampling masterbatch production (including sampling machine) Pet Flakes Production and Washing Line Three crashing units (cutting/breaking pet bottles, from bottles to flakes) Five washing pools Two mixers Five separation bands Four vertical centrifuges Thirteen transfer spirals (in between each machine, along the complete line) Three shining flakes Power Requirements 3000 kW electric power is needed to run all above detailed complete fibre factory Two separate electric stations (trafo): 1600 kW + 2000 kW = total 3600 kW