Siemens, SGT-200 and SGT-300, CHP Power Plants, Natural Gas, 50Hz, 6.5MVA and 7.4MVA

Description

  1. Overview
    1. Two chp power plants available
    2. Both plants are in excellent condition and can be tested on site
    3. Both have new core engines
  2. Plant 1
    1. Sgt-200 model, 50 hz, natural gas with a 6.5 mva alternator
    2. Gt1 tornado sgt200, 2400 starts, 6.5 mva (core exchange year 2013)
  3. Plant 2
    1. Sgt-300 model, 50 hz, natural gas with a 7.4 mva alternator
    2. Gt2 tempest sgt300, 1630 starts, 7.4 mva (core exchanger year 2013)
  4. Maintenance And Service History
    1. Both gas turbines were fully overhauled to return to ‘zero hours’ during the second half of 2013, prior to returning to service for stor duty
    2. Since overhaul, the gas turbines have accumulated a relatively low number of operating hours with operations for triad periods and stor only, as a guide this equates to 700 hours per year for each set
    3. Both units are fully maintained and serviced by the on-site team
    4. “Service a” scheduled services are completed every quarter
  5. Additional Information
    1. More information is available upon request