Production speed can vary due to polymer quality, masterbatch content and crimp level
Personnel Requirement
1 shift leader (temporary, skilled) – additional plants can be controlled
2 plant operators (per shift, unskilled)
1 textile laboratory (temporary, skilled) – additional plants can be controlled
2 maintenance (temporary, skilled) – additional plants can be controlled
For start-up training and commissioning, additional personnel is required
Energy Consumption
Only the consumption of the Neumag delivery volume has been considered (without chiller, without compressor station)
Electrical power: 0.8 kWh/kg yarn
Compressed air: 3.7 m³/kg yarn
Space Requirement
Approximately 11.0 m x 14.0 m x 14.0 m (height x depth x width)
Including space for switch cabinets
Raw Material Supply
1 chips suction conveying system for filling silo (for PP)
1 chips storage system (silo)
1 central chips conveying system for feeding 3 extruders (for PP)
3 metering and mixing devices, type gravimetric (for PP)
Spinning Equipment – For 3 Spinning Positions
3 extruders for PP, throughput each 70 to 250 kg/h
3 gauge heads, stainless steel
1 polymer distributing pipeline for 6 positions (including melt flow changing plate type Variomelt)
1 spinning beam arrangement 1 x 3 pos., pitch 1400 mm (heating system: Dowtherm vapour)
18 spinning pumps, 3 x 10 cm³/rev.
108 spin packs, round design (54 in operation, 54 on standby)
108 spinnerets, profile: trilobal, number of holes to be specified at design meeting (54 in operation, 54 on standby)
6 quench air chambers
1 air supply/exhaust system for 6 positions consisting of: 6 monomer exhausting nozzles, 1 monomer exhausting pipeline, 6 interfloor ducts, 1 air washer for 6 positions, 1 feed air distributing duct, 1 set of fans (1x cooling drum, flue gas and tangling, 1x texturizing device)
1 Dowtherm system for 6 positions
1 Dowtherm vapour generator 60 kW
1 quench air unit for 6 positions, air volume 32,000 m³/h, temperature controlled
1 chilled water tank
1 chiller (cooling power depends on local conditions and must be stipulated during the design meeting)
1 steel frame for 6 positions (structure laid out for accommodating extrusion system, spinning beam, manifold and quenching system, including handrails and stairs)
1 spin pack mounting and transporting device
Texturizing System – For 6 Texturizing Positions
1 draw texturizing machine, type S5, pitch 1400 mm, 6 positions
1 compressed air supplying unit, inlet pressure 10 bar (compressed air supplied by customer)
3 threading injectors with controller station and hoses (supply pressure 10 bar)
6 yarn exhausting devices with air mover
6 spin finish application systems, type pin preparation, 2 rows
1 set of pre-tangling devices for 6 pos., 3 ends/pos.
6 cam roll systems with drives
6 yarn cut-off devices
1 set of godets for 6 pos., inductive heating, max temp. 220°C consisting of: 6 inlet godets with idler rolls (unheated), 6 draw godets with idler rolls (heated), 6 godet duo I (heated), 12 draw-off godets with idler rolls (unheated)