Description Overview Cleaver Brooks firetube boiler Model: 500 hp Year: 1989 Capacity: 500 4 pass dry back design Gas and number 2 oil fired 150 psi design pressure Condition and Preparation Boiler will be cleaned on the fireside, waterside, inside, outside and painted Boiler pressure vessel, tubes, piping and blowdown valves will be hydrostatically tested Boiler will be electrically and mechanically checked throughout to identify and replace any defective components Pressure vessel and tubes are guaranteed to be in good condition and the boiler will pass a hydrostatic test at the time of startup Controls and Components New Honeywell 7800l flame safeguard controls Honeywell high limit with manual reset, operating limit and modulating limit controls will be installed Warranty 1 year parts replacement warranty on all controls