Inlet steam pressure for front of main stop valve: 102 kilograms/cm2g, temperature for front of main stop valve: 538 degree c
Reheating steam condition: pressure for front of reheat stop valve: 27.8 kilograms/cm2g (at the time of normal output) temperature for front of reheat stop valve: 538 degree c
Ventilation condition: degree of vacuum (incase of sound sir pressure as 760mhg at ventilation room) 722 mh/g
Extraction number of step 5 steps
Water supply temp (at the time of normal output) 233.1 degree c
Allowance steam condition: allowance pressure (front of main stop valve) average allowance pressure incase of continuous moving: 107 kilograms/cm2g
Maximum allowance pressure: 112 kilograms/cm2g
Emergency time maximum average allowance pressure: 132 kilograms/cm2g
Allowance temperature (front of main stop valve and reheat stop valve) average allowance temperature at the time of continuous moving: 538 degree c
Maximum allowance temperature at 546 degree c
At emergency time (remark2) 551 degree c, (remark3) 566 degree c
Remark 2 not more than 400 total hours at the time of moving 12 months continuous moving
Remark 3 not more than 800 total hours
Turbine Specifications
Turbine number of steps: high temperature turbine inpulse steps (cartis step) 1 step (2 lines)
Reverse step 12 steps
Middle pressure turbine reverse step 15 steps
Low pressure turbine reverse step 2 x 8 steps
Rated gas pressure 2 kilograms/cm2
Weights and Dimensions
Approximate weight: high, middle pressure turbine outer room upper side about 16 tons
Low pressure turbine outer room upper side about 12 tons
Low pressure fin upper side about 13 tons
High middle pressure turbine rotor about 12 tons
Low pressure turbine rotor about 13 tons
Rotor 120 tons, starter 26 tons, thers 13 tons
Turbine package size: 10.09mtr h x 4 mtr+0.64 x 2.8 mtr
Scope of Supply
Generator part
Control unit
Part of boiler (material cokes)
Duplication oil supply unit
Other annexed equipment
Condenser part to be out of scope since present owner using this part for their new turbine generator
Boiler part to be take out only part to part since too ig size and impossible to take out all
Additional Notes
Cooling water was using sea water (condenser part is out of scope)
Boiler size is about 7 floor building which we think it is difficult to take out and may have to make new and maybe only some inside part can be remove
Request a Quote
✓
Request sent
Thank you, our team will reply to you shortly.
Direct access to our team
Email American Plant & Equipment
Tell us what you want to buy, source, finance, or sell. A machinery specialist will follow up with you.
✓
Thank you. Your request is with the American Plant and Equipment team.
A machinery specialist will follow up with you.
Machinery updates
Subscribe to our email list
Tell us which industries you follow and we will send you the machines that match.
✓
You are on the list.
We will email you when machines that match your interests come in. Unsubscribe from any message.