Zinser, Rieter, Complete Spinning Plant, Modernized 2008, Prepared for Fireproof Thread

Description

  1. Overview
    1. Spinning plant completely modernized in 2008
    2. Prepared to work fireproof thread
    3. Plant is completed with all its mechanisms to operate at the time
    4. Production of thick yarns types and types of material that can work this spinning
  2. Specifications
    1. Moisture conditioner for the entire factory with water filters and different compartments, approximately 20 m long and 4 m wide
    2. 2 chambers for drying the yarn
    3. Central temperature / humidity of approximately 20 m x 4 m
    4. 2 cabins drying
    5. 1 boiler VYC 12 bar
    6. 1 autoclave Tainox
    7. 1 electric industrial scales
    8. 1 opening (Rieter)
    9. 1 carding Rieter
    10. 1 carding Rieter
    11. 1 drawing frame (24)
    12. 1 roving frame (24)
    13. 5 spinning frame G/01, Zinser (118 x 2 unit)
    14. 1 spinning frame G/01, Rieter (108 x 2 unit)
    15. 1 automatic Schlafhorst Autoconer (40)
    16. 1 full laboratorio
    17. 2 compressors (25 and 30 hp)
    18. 1 dryer
    19. 1 deposit of air
    20. All accessories in the factory
  3. Condition
    1. Stock also no thread in lycra, also materials in bales