Siemens, SGT-800, 2012, Combined Cycle Power Plant, 2x 47.5MWe Gas Turbines, 1x SST-400 Steam Turbine

Description

  1. Overview
    1. New and used SGT 800 combined cycle plant
    2. All equipment was manufactured and shipped in 2012 to 2013
    3. Partially installed on foundations
  2. Gas Turbines
    1. 2 x gas turbines (full set) Siemens SGT-800
    2. 47.5 MWe, 50 Hz
  3. Steam Turbine
    1. 1 x steam turbine (full set) Siemens SST-400
    2. Simple cycle – 38.2 MWe
    3. Combined cycle – 26.5 MWe
    4. Steam turbine generator AMS 1250 LG (ABB)
  4. Waste-Heat Steam Boilers
    1. 2 x waste-heat steam boilers (full set) type PR-59/12-7.45/0.7-518/214 (PK-83)
  5. Fuel Gas Equipment
    1. Fuel gas treatment station 2 x 14108 m3/h (Eltacon)
    2. Fuel gas treatment station 2 x 14108 m2/hr (Eltacon)
    3. Fuel gas compressor ELT-321/1400
  6. Additional Components
    1. Foundation embedded parts set for SGT 800
    2. Protective automation units from Siemens (short circuit to ground; generator’s low frequency)