Description Overview Six Capstone C65 65 kW gas turbines with integrated combined heat and power (ICHP) modules installed While not new, these turbines are only a very short way through their operational life Logged run hours: turbines 1 and 2: 91.9 hours; turbines 3 and 4: 2,326.6 hours; turbines 5 and 6: 4,150.4 hours Any combination of 65 kW in a single installation: 65 kW, 130 kW, 195 kW, or 390 kW Grid connected or in island mode For permanent installation on a chassis or in plinths For temporary installation on a chassis containerised along with an LPG bullet As backup power and for peak load reduction In concert with a large solar PV system to provide continuous power output Cogeneration for electricity and heating Trigeneration for electricity, heating and cooling Included Equipment Six Capstone C65 65 kW gas turbines with ICHP modules installed Six heat recovery water pumps Six pump variable speed drives Three plate heat exchangers Capstone control modules One Siemens 11 kV to 415 V pad mount kiosk substation transformer Condition and Configuration Turbines 1 to 6; turbine 6 is in the foreground The heat recovery unit is shown on top of each turbine Turbines 2, 4 and 6 have a gas pack (compressor) unit installed The heat recovery unit is shown on top of each turbine with uninsulated copper pipework leading into and out of each turbine from the top Heat exchangers 1 to 3 Heat recovery pumps 1 to 6 Pumps 1 to 3 (cold side) are in the foreground; pumps 4 to 6 (hot side) are in the background