Dongfang, N55-8.83-1, 1994, Complete Coal Fired Power Plant, 55 MW, 220 T/H Boiler Capacity

Description

  1. Primary Element Parameters In Thermal Control System
  2. Inspection And Packing Procedure
    1. The standard procedure is that the client inspects the power plant along with their technical consultants and approves the same.
    2. After approval, the client or their consultant specifies the type of packing required for each component of the power plant (this varies vastly as per the client’s site and shipping conditions, cost of packing, etc.).
    3. After the type of packing is specified, the shippers then visit the site to get the dimensions of the cargo and how to fit it in the least number of containers.
    4. The exact number of containers required can be determined at this point only.