GE Jenbacher, JMS 616 NL, Complete Power Plant, 2670 kW, Natural Gas (New)

Description

  1. Overview
    1. Gas generator sets
    2. Capacity of each: 2670 kW
    3. Fuel used: natural gas
    4. Brand: GE Janbéchar
    5. Model: JMS 616 NL
    6. Basic generating set
  2. Engine And Alternator
    1. Natural gas based spark ignited gas engine with accessories, scope by GEJ
    2. Alternator, 11 kV, 50 Hz, 1.0 p.f., 1500 rpm, scope by GEJ
    3. Flexible coupling for engine/alternator, scope by GEJ
    4. Common base frame, scope by GEJ
    5. Anti-vibration isolators, scope by GEJ
    6. Flexible connections, scope by GEJ
  3. Combustion Air Intake And Exhaust System
    1. Intake air splitters, scope by GEJ
    2. Exhaust silencer, scope by CEIPL
    3. Flexible bellows at t/c outlet (after turbo), scope by GEJ
    4. Exhaust ducting from genset to chimney (total running 15 meters per set in silencer loop only) and flexible bellows, scope by CEIPL
    5. Support structure for above referred exhaust piping, scope by CEIPL
    6. Exhaust stack/chimney, scope by CEIPL
  4. Cooling System
    1. HT pump, scope by GEJ
    2. HT water circulating pump, scope by CEIPL
    3. LT pump with motor, scope by GEJ
    4. Jacket water preheater, scope by GEJ
    5. TCV in HT circuit, scope by GEJ
    6. Mixture intercooler water thermostat, scope by GEJ
    7. Expansion water tank (HT + LT), scope by GEJ
    8. Radiator in HT circuit, scope by CEIPL
    9. Interface cooler (LT circuit), scope by CEIPL
    10. LT cooling water distribution system, scope by CEIPL
    11. Jacket water spilling system (HT circuit), scope by CEIPL
    12. Hot water piping from genset to VAM including pumps, valves etc., scope by CEIPL
  5. Lube Oil System
    1. Fresh lube oil filling system comprising of tank, pump, piping with necessary valves, bends and fittings, scope by CEIPL
    2. Lube oil cooler, scope by GEJ
    3. Lube oil splitters, scope by GEJ
    4. Solenoid valves for automatic oil top up, scope by GEJ/CEIPL
    5. Arrangement for used lube oil, scope by CEIPL
  6. Starting System
    1. Starting battery, motor and cables
    2. Starting battery, 24 V, scope by GEJ
    3. Engine electric starter motor, scope by GEJ
    4. Cables with clamps, scope by CEIPL
    5. Charger for above 24 V battery, scope by GEJ
  7. Fuel Gas System
    1. Fuel gas pipework along with necessary supports from the main gas valve up to the genset, scope by CEIPL
    2. Gas train unit, scope by GEJ
    3. Flexible gas pipe/hose, scope by GEJ
    4. Gas flowmeter in the gas inlet line to engine, scope by CEIPL
  8. Electrical Power And Control System
    1. Control panel for engine management, control and supervision all relevant functions of gas engine, with single synchroniser, scope by GEJ
    2. Master control panel (island mode/grid mode), scope by GEJ
    3. Battery bank with charging system for GCBP, scope by CEIPL
    4. Generator incomer power panel, scope by CEIPL
    5. PAP (plant auxiliary panel) for genset auxiliaries, scope by CEIPL
    6. Auxiliary transformer, bus PT and NGR panel, scope by CEIPL
    7. Earthing strips from earthing station to the earthing grid near the earthing pits, scope by CEIPL
    8. Earthing strips for vendor supplied electrical installations within the GE house, scope by CEIPL
  9. Electrical Installation Material
    1. Power cables from alternator to the genset power panel, scope by CEIPL
    2. Control and instrument cables with termination kits, lugs, cable trays/racks etc. as required for interconnecting the system within the GE house between the genset and genset panel supplied by the vendor, scope by CEIPL
  10. General
    1. Air conditioner for the control room, scope by CEIPL
    2. Ventilation system for giving provision for combustion air and room air flow out of the power house as per vendor requirement, scope by CEIPL
  11. Engineering, Installation And Supervision Services
    1. Engineering of power plant, scope by CEIPL
    2. Documentation, instruction manuals, drawings, scope by CEIPL/GEJ
    3. Erection, installation, testing and commissioning of all power plant equipment supplied by vendor, scope by CEIPL
    4. Resistive load bank during commissioning, scope by CEIPL
    5. First fill of lube oil, chemicals, coolant, antifreeze agent, battery acid and other consumables for commissioning and thereafter for the first year of operation, scope by CEIPL
  12. Standard Tools
    1. Standard tools, scope by GEJ