Siemens, CCCP, 2013, 205 MW, 54% Efficiency, 3x GT 47 MWe, 3x HRSG 70 t/h, 1x STG 64.5 MWe

Description

  1. Overview
    1. Supplied and commissioned by Siemens as a turn-key package in 2013.
    2. Owner has concluded a long-term service agreement (LTSA) with Siemens effective for 15 years starting from 2013.
    3. Combined cycle gas turbine (CCGT) power plant with a net CC efficiency around 54%.
    4. Operating mode allows daily starts and stops.
  2. Main Equipment
    1. 3 gas turbines, each 47 MWe.
    2. 3 heat recovery steam generators (HRSGs), each 70 t/h steam.
    3. 1 steam turbine generator (STG) with 64.5 MWe.
  3. Inspection
    1. Inspection can be arranged on short notice.