The trailers include the main trailer and auxiliary trailer.
The inlet air filter assembly and exhaust duct assembly ship loose and are assembled onto the main trailer during commissioning.
Seller will ship spare parts and tools as required.
Three units are included in this offering.
Main Trailer
Main trailer and jeep: a seven-axle, air ride suspension trailer (3+4) and a 3-axle jeep are used to transport the main trailer components.
The trailer and jeep combination is approximately 108 ft (32.9 m) long (less tractor) during transport and weighs approximately 210,000 pounds (95,254 kg) fully loaded.
At the jobsite, the jeep and trailer gooseneck are removed as well as the 3 rear axles of the trailer.
With these pieces removed, the main trailer is approximately 68.25 ft (20.8 m) long during operation, measured from the plenum on one end to the footing on the other.
Ten landing legs are provided to support and level the equipment at the jobsite.
Appropriate site foundation is not part of the scope of supply.
Gas turbine: a General Electric LM2500 PKMDW model ISO rated for continuous duty and configured for operation on either natural gas or liquid fuel.
Each is configured for optional water injection for nox reduction, if required.
Altitude, humidity, and inlet and exhaust losses will affect power output and heat rate.
In addition to the inlet air filter, the engine is equipped with a stainless steel mesh screen in the inlet air stream for last chance protection against foreign object damage.
The engine is shock mounted for shipping and shipped in position, with the exception of the coupling spacer, which is installed during commissioning.
Generator: an air-cooled, open air, 2-pole, 50/60 hz, 0.85-0.99 pf (lagging) capable brush generator.
The generator includes a brushless excitation system with permanent magnet generator.
Neutral, line side cubicles, medium voltage switchgear are included.
The generator is hard mounted to a base on the main trailer and includes generator air inlet filtering and air silencing.
The generator is operated at class f temperature rise.
Turbine enclosure: the equipment package is supplied with a weatherproof acoustic enclosure for the gas turbine.
The enclosure is completely assembled and mounted over the equipment prior to testing and shipment.
Provisions for turbine removal and personnel access are included.
The turbine compartment is fully ventilated by 2 x 50% ventilation fans (provided in the air filter).
Fuel system: the gas turbine, auxiliary equipment, and controls are all configured for gas, liquid, or dual fuel operation.
The TM2500+ is supplied with a natural gas fuel system using an electronically controlled fuel-metering valve.
For full-load operation, the gaseous fuel must be supplied to the auxiliary trailer skid connection at: 320 mmbtu/hr max; 180 °f (82 °c) max; 520 +/- 20 psig (3,585 +/- 138 kpag); and filtered to 5 or less microns.
The buyer must provide gas fuel that is clean, filtered and compliant with general electric specification mid-td-0000-1.
The package is also equipped with a liquid fuel system; typical liquid fuels include df1, df2, or jp4.
For full-load operation, buyer must supply liquid fuel to the connection at the auxiliary trailer skid at 40 gpm (151.4 l/min), 30 +/- 10 psig (207 +/- 69 kpag), filtered to 5 microns and at least 20 °f (11 °c) above the wax point temperature.
The buyer must provide liquid fuel that is clean, filtered and compliant with general electric specification mid-td-0000-2.
All necessary shutoff valves, flow meter, piping and instruments between the auxiliary trailer skid connection and the engine are included.
Buyer must provide supply piping with sampling ports, fuel system filtration and applicable shut-off valves and containment per local codes and standards.
Water injection system: the equipment package is capable of water injection for nox reduction.
For full-load operation, the demineralized water must be supplied to the auxiliary trailer skid connection at 28 gpm (106 l/min), 15 psig (103 kpag) minimum, 40 to 140 °f (4 to 60 °c) filtered to 10 microns.
The buyer must provide demineralized water that is clean, filtered and compliant with general electric specification mid-td-0000-3.
All necessary shutoff valves, flow meter, piping and instruments between the auxiliary trailer skid connection and the engine are included.
Buyer must provide supply piping with sampling ports, fuel system filtration and applicable shut-off valves and containment per local codes and standards.
Lube oil systems: the equipment package is supplied with two separate lube oil systems; one for the gas turbine and one for the generator.
The oil reservoirs and piping are all stainless steel, and the lube oil system valves have stainless steel trim.
Each lube oil system has a pump, simplex filters, necessary valves and instrumentation, and thermostatic-controlled electric heaters.
A dual fan, single core fin fan cooler is provided to cool turbine, generator lube oil and hydraulic oil.
The cooler is mounted on the auxiliary trailer and the rest of the lube oil systems are mounted on the main trailer.
Buyer must provide any additional containment per local codes and standards.
Switchgear: the equipment package is supplied with a 3 section nema 3r switchgear enclosure.
The switchgear includes a set of generator circuit breaker equipment, 2 sets of incoming line voltage monitoring equipment, a marshaling cabinet and a set of switchgear accessories.
Permanent cable terminations from the neutral and line-side of the generator are also included.
Auxiliary Trailer
The auxiliary trailer is approximately 48 ft (14.6 m) long and 8 ft 6 in (2.6 m) wide and weighs approximately 62,000 pounds (28,122 kg) fully loaded.
The trailer is provided with a tandem air ride suspension and includes the equipment listed below.
Four landing legs are provided to support and level the trailer at site.
Auxiliary trailer skid: includes fuel and water injection system components not mounted on the main trailer.
The pumps, filters and necessary instrumentation are connected to the main trailer components at site with interconnect hoses.
The auxiliary trailer skid also includes the hydraulic start system and water wash system described below.
Electro-hydraulic start system: the equipment package is supplied with a hydraulic starting system, which includes an electric motor driven hydraulic pump assembly, filters, and a fin/fan heat exchanger mounted on the auxiliary equipment module.
A hydraulic motor is also mounted on the gas turbine accessory gearbox to turn the gas generator shaft.
All piping and fittings on the base plates, plus hydraulic connections between the auxiliary equipment module and the main base plate are also furnished.
Off line soak wash system: the equipment package is supplied with an off-line cleaning system, with a water wash reservoir and all necessary filters and instrumentation supplied.
Buyer is required to provide purified water to the standards listed in the water injection system.
Fire protection system: the equipment package is supplied with an installed fire protection system complete with hydrocarbon sensing and thermal detectors, piping and nozzles in the engine compartment.
The fire protection system includes cylinders containing co2 mounted on the auxiliary trailer.
An included 24 vdc battery and charger powers the system.
Request a Quote
✓
Request sent
Thank you, our team will reply to you shortly.
Direct access to our team
Email American Plant & Equipment
Tell us what you want to buy, source, finance, or sell. A machinery specialist will follow up with you.
✓
Thank you. Your request is with the American Plant and Equipment team.
A machinery specialist will follow up with you.
Machinery updates
Subscribe to our email list
Tell us which industries you follow and we will send you the machines that match.
✓
You are on the list.
We will email you when machines that match your interests come in. Unsubscribe from any message.