LNG Plant, 100 Metric Tons Per Day, 3.7 MW, 2008

Description

  1. Overview
    1. 100 metric tons per day natural gas liquefaction plant
    2. Commissioned in 2008 to 2009
    3. Ran for 4 months
    4. Operated no more than 4 months before shutdown due to non-availability of natural gas feedstock
    5. Can accommodate very poor feed gas quality (high CO2 and N2 content)
  2. Specifications
    1. Feed gas pressure: minimum 28 barg, up to ~100 barg
    2. Plant feed gas flow rate: 7 Nm3/h
    3. Power: 3.7 MW, 3 phase, 50 Hz
    4. 3 LNG storage tanks for 1.5-days production (150 mtd)
    5. Double LNG truck-filling pumps
    6. Single truck-filling loading bay
    7. Weighing scale
  3. Condition
    1. Shutdown due to non-availability of natural gas feedstock
  4. Included
    1. 3 LNG storage tanks for 1.5-days production (150 mtd)
    2. Double LNG truck-filling pumps
    3. Single truck-filling loading bay
    4. Weighing scale