Description OverviewUsed Siemens SGT-300 TEMPEST gas turbine cogeneration plantIncludes Converteam generator and complete Heat Recovery TrainFuel: natural gasDry Low Emissions (DLE)Year of manufacture: 2007Commissioned: 2008Operated until November 2025PerformanceElectrical output (ISO): 7.9 MWSite output (actual): approx. 7.6 MWElectrical efficiency: approx. 30.5%Exhaust gas temperature: 545 C (1,013 F)Exhaust gas mass flow: 30.2 kg/s (66.6 lb/s)GeneratorConverteam AC generatorRating: 9,800 kVAVoltage: 6.3 kVFrequency: 50 HzSpeed: 1,500 rpmOperating DataOperating hours: 116,131 hNumber of starts: 677Control SystemController: Allen-Bradley ControlLogixParallel with the grid and island modeScope of SupplyGas turbine generator packageReduction gearboxHeat Recovery Train H210-H430Two exhaust stacksSpare partsTechnical archiveHeat Recovery TrainH210 DOWTHERM A thermal oil: 4,300 kW (5,766 hp)H310 SANTOTHERM 66 thermal oil: 3,880 kW (5,203 hp)H410 high-pressure steam, 25 barg: 1,671 kW (2,241 hp)H420 low-pressure steam, 3.5 barg: 1,931 kW (2,590 hp)H430 hot water: 2,428 kW (3,256 hp)Service History2020: generator overhaul2021: grid-parallel and island-mode tests, up to 7 MW2023: Type A service and borescopeJune 2025: replacement of the high-pressure bladed disc, seals and reconditioned SSS coupling, borescopeSeptember 2025: Type A serviceNovember 2025: end of operation