Description OverviewTwin-engine block: 2 Pratt & Whitney FT8 gas turbines driving opposite ends of one generatorYear: 1994About 71,000 hoursStanding in place; shut down in 2024 and maintained sinceSpecificationsOutput: 50.1 MW, generator-limited (62,625 kVA at 0.8 power factor)11,000 V, 50 Hz, 3,000 rpm direct drive, no gearboxFuel: natural gas; water injection for NOxGenerator: Brush BDAX 7-290ER, air cooledPlant ArrangementOperated in 2x1 combined cycle with a dual-pressure heat recovery steam generator and a 16 MW condensing steam turbineScope to be confirmed