Pratt & Whitney, FT8 Twin, 1994, Gas Turbine Generating Block, 50.1 MW, 11,000 V, 50 Hz, Natural Gas, 71,000 Hours (Same as TT-5956)

Description

  1. Overview

    1. Twin-engine block: 2 Pratt & Whitney FT8 gas turbines driving opposite ends of one generator

    2. Year: 1994

    3. About 71,000 hours

    4. Standing in place; shut down in 2024 and maintained since

  2. Specifications

    1. Output: 50.1 MW, generator-limited (62,625 kVA at 0.8 power factor)

    2. 11,000 V, 50 Hz, 3,000 rpm direct drive, no gearbox

    3. Fuel: natural gas; water injection for NOx

    4. Generator: Brush BDAX 7-290ER, air cooled

  3. Plant Arrangement

    1. Operated in 2x1 combined cycle with a dual-pressure heat recovery steam generator and a 16 MW condensing steam turbine

    2. Scope to be confirmed