Description Overview2 used Elin KR 25 tapping back-pressure steam turbines, built 1964, each with gearbox and generatorNatural gas fired boiler included in the scope of supplyTurbine No. 1Rated 3,800 kW (5,096 hp) at the generator terminalsSpeed: 10,000 rpmVoith D 64 spur gearbox, 5,700 hp (4,250 kW)Absorption capacity: up to 32 t/h (70,550 lb/h)Turbine No. 2Rated 4,300 kW (5,766 hp)Speed: 9,900 rpmBHS RP 40x gearbox, 6,500 hp (4,847 kW)Elin Sv 850 x/4 synchronous generator, 5,380 kVABoilerCovers the steam demand of one turbineMaximum operating pressure: 44 bar(g) (638 psig)Maximum operating temperature: 450 °C (842 °F)Natural gas heat capacity: 36 MWSteam output: around 40 t/h (88,185 lb/h)ConditionBoth burners and the associated control system were replaced in 2016The boiler cannot be transported in one piece; it would have to be cut apart and welded back together on site