6 Fire-Tube Steam Boilers, 200 to 613 BHP, Power Master 300 BHP 2021 LPG, Cleaver Brooks 400 BHP 2013, Hirakawa 613 BHP, Kisha Seizo 383 BHP, Cleaver Brooks 300 and 200 BHP, Fuel Oil

Description

  1. Overview

    1. 6 fire-tube steam boilers from the boiler house of a woven fabric mill, offered on one sheet.

    2. 200 to 613 BHP each, 2,196 BHP in total; 1 fired on LPG, 5 on fuel oil.

    3. Condition: used.

  2. Boilers

    1. Boiler DA1: Power Master, 300 BHP, 3-pass, built 2021, fired on LPG.

    2. Boiler No. 2: Hirakawa, 613 BHP, 3-pass, built 1973, fired on fuel oil; flue-gas stack built at the side from floor level; electrical control panel renewed in 2023.

    3. Boiler No. 3: Kisha Seizo, 383 BHP, 3-pass, built 1970, fired on fuel oil; electrical control panel renewed in 2024.

    4. Boiler No. 4: Cleaver Brooks, 400 BHP, 4-pass, built 2013, fired on fuel oil; combustion control by FARC (fuel air ratio controller).

    5. Boiler No. 5: Cleaver Brooks, 300 BHP, 4-pass, built 1962, fired on fuel oil; linkage combustion control; electrical control panel renewed in 2024.

    6. Boiler No. 6: Cleaver Brooks, 200 BHP, 4-pass, built 1961, fired on fuel oil; its FARC combustion control does not work and has no spare parts left, so it needs a new automatic combustion system or a return to linkage control.