Description
Overview
Complete brewery covering brewhouse, yeast handling, fermentation control, filtration, cooling and utilities
Main vessels by TM INOX
Year 2014, with components manufactured between 2004 and 2014
Configured for beer production, covering key stages from brewhouse operations and yeast handling through fermentation, filtration, cooling, utilities and laboratory control
Main electrical cabinet dated 2012 and fermentation control equipment dated 2013
Prepares beer upstream of bottling, canning or kegging (not a filling line)
Capacity And Performance
70 hl brew length
1,400 liters/hour
Steam generator rated at 1,500 kg (3,310 lb)/h
Brewhouse Vessels
Two 3.5 m3 (123.6 cu ft) mash boiling tanks
7.8 m3 (275.5 cu ft) malt filter tank
7 m3 (247.2 cu ft) hop boiling tank
7.2 m3 (254.3 cu ft) buffer tank
7.5 m3 (264.9 cu ft) whirlpool tank
10 m3 (353.1 cu ft) hot water tank
Yeast Section
2.1 m3 (74.2 cu ft) yeast tank
1.5 m3 (53.0 cu ft) sterile tank
Yeast mill
Filtration
Kieselguhr filter
Sterile filtration unit
Beer flow metering after filtration
Controls And Electrical
Main brewery electrical cabinet
Brewhouse command panel with software
Pneumatic valve control board
Pump control cabinet
Mixer motor cabinet
Fermentation command cabinet with software
K&P heat control electronics
Process And Utilities
Process pumps, stainless steel piping, steam distribution and glycol installation connect brewing, fermentation, filtration and cooling stages
Steam distribution with 1,500 kg (3,310 lb)/h steam generator
Glycol cooling installation
Stainless process piping
Process supports mash processing, wort boiling with hops, whirlpool separation, yeast preparation, fermentation control, kieselguhr filtration and sterile filtration, with beer flow measurement after filtration
Equipment List
Yeast mill / VELO / 2004
Hot water tank, 10 m3 (353.1 cu ft) / TM INOX / 2014
Mash boiling tanks, 3.5 m3 (123.6 cu ft) (2) / 2004
Malt filter tank, 7.8 m3 (275.5 cu ft) / TM INOX / 2014
Hop boiling tank, 7 m3 (247.2 cu ft) / TM INOX / 2014
Buffer tank, 7.2 m3 (254.3 cu ft) / TM INOX / 2014
Whirlpool tank, 7.5 m3 (264.9 cu ft) / TM INOX / 2014
Yeast tank, 2.1 m3 (74.2 cu ft) / TM INOX / 2014
Sterile tank, 1.5 m3 (53 cu ft) / 2004
Kieselguhr filter / BUCHER Filtrox / 2014
Sterile filtration / PALL / 2014
Chiller / MTA / 2004
Condition
Ready for operation (used)
About 10,000 operating hours
Safety features included
Manuals included
Footprint And Installation
Footprint 12000 x 12000 mm (472.4 in), height 4500 mm (177.2 in)
Installation for brewhouse vessels, fermentation and filtration, electrical cabinets, steam distribution, glycol cooling and stainless process piping
