GE, LM2500-PE SAC, 20 MW, Gas Turbine Core, Gas Generator and 6-Stage Power Turbine, Overhaul Required

Description

  1. Overview

    1. Scope of supply: GG and PT only; no generator, no enclosure, no controls

    2. Duty since 2006: land-based power generation, natural gas

  2. Specifications

    1. Output: 20 MW

    2. Frequency: 50/60 Hz (no alternator)

    3. Gas generator (GG): overhauled in 2006 and performance tested after the overhaul

    4. Power turbine (PT): new in 2006

    5. Hours since 2006: about 28,500

    6. Starts: about 430 in total

  3. Condition

    1. Used, overhaul required

    2. Hot section is past its 25,000-hour interval

    3. Last operated in 2012, installed in its enclosure since

    4. Last load test (2010): 17.4 MW at 23 °C (73°F), T5.4 at 750 °C (1,382°F), GG vibration under 1 mil

    5. Last borescope (2010): compressor, HPT and PT with no findings

    6. Combustor with partial coating burn, no material loss

    7. All magnetic plugs clean

  4. Documentation

    1. BSI report available

    2. Inspection and load test records available

    3. Operating hours by year available