NovaStar, CP165, Continuous Soap Noodles Plant, 6,000 kg/hr, with Steam Boiler (New)

Description

  1. Overview

    1. NovaStar CP165 complete continuous soap noodles plant (soap production line), 6,000 kg/hr (13,200 lb/hr, 6 tons per hour) nominal capacity

    2. Condition: New

    3. Turndown 50 to 100%, continuous operation up to 24 hours per day

    4. Final product: toilet soap noodles, 78 to 80% TFM (total fatty matter), 13 to 15% moisture

    5. Feedstock: neutral oils, distilled fatty acids (DFA) or their blends; two separately dosed oil / DFA streams plus caustic soda, water and additives (NaCl, EDTA)

  2. Scope of Supply

    1. Raw material dosing and storage tanks

    2. Oil decoloring line, 100 tons/day, 184 kW (246.7 hp)

    3. Saponification section, 6 tons/hr, PLC-controlled dosing of oil and caustic soda solution

    4. Vacuum drying section with vacuum spray dryer, 6,000 kg/hr (13,200 lb/hr), barrel diameter 1700 mm (66.9 in)

    5. Noodle discharge, weighing station and soap noodles air delivery line, 28 kW (37.5 hp)

    6. Boiler / steam supply system

    7. Control system: PLC panel and instrumentation

    8. Accessories: pipes, valves, platforms, 22 kW (29.5 hp)

    9. Installation drawings, commissioning support and operator training at the factory

    10. Standard export packing

  3. Not Included

    1. Water treatment system

    2. Civil works, foundations, on-site piping between battery limits and local utility connections

    3. On-site installation and commissioning abroad (available as an option)

    4. Soap finishing (forming and plodding) section

  4. Utilities and Space

    1. Installed power: about 550 kW (737.6 hp), 3 phase, built to the buyer's power supply, including US 480 V / 60 Hz

    2. Steam: about 6 t/h (13,200 lb/hr) at 1.25 MPa (181.3 psi)

    3. Circulating water for the vacuum drying system: 100 m3 (26,400 US gal)

    4. Floor area: about 100 x 20 m (328 x 66 ft), clear height 9 m (29.5 ft), plus space for the boiler house and electrical room

  5. Main Components

    1. Schneider electrical components

    2. Siemens converters and Siemens PLC system

    3. ABB motors

    4. Machines in stainless steel 304 (oil decoloring line in carbon steel)

  6. Lead Time

    1. 90 business days after order confirmation