Description Overview Turbine solar centaur 50 with approximately 37,000 working hours Fuel: natural gas / heating fuel Firing thermal capacity 14.35 / 13.43 mw Gas pressure: approximately 14 bar If used with heating oil, water can be pumped into the system in order to reduce nox Put into operation as a zero hour turbine in april 2008 Stopped: december 2012 Continuous maintenance by turbomach, abb and properly qualified own staff Generator Specifications Generator: leroy somer Generator power: max 4.6 mw Drive power: 10.6 kv Cycle: 50 hz Efficiency: approximately 27% Component Hours Turbine: approximately 37,000 working hours Gearbox: approximately 100,000 working hours Scope Of Supply Package including turbine Generator Gearbox Co2 fire suppression system Start system Booster pump fuel oil Gas safety equipment in the direct gas strand of the turbine Hydraulic pump High pressure water pump for the pumping of purified water into the fuel oil