Description Overview 46 MW GE LM 6000 PC sprint gas turbine Brush turbo generator Complete combined heat and power plant, natural gas fired Year of commissioning: 2006 Total running hours: 43,970 hrs Specifications 11.5 kV, 50 Hz Included Systems Transformers, electrical systems, and electrical panels Control systems, air system, cooling system, and lubricating system Exhaust system, pumps, water system, and firefighting system Heat recovery steam generator (HRSG) Condition Maintained by original equipment manufacturer since new Turbine package available for immediate sale