Description Overview Gas turbine 80 mw x 4 Make: GE Year: 1992 Model: MS-7001EA Frequency: 60 Hz Open cycle Stop: December 2017 Major inspection (overhaul) year: 2012 to 2014 Last inspection: year 2017 Gas Turbine Make: GE Start year: 1992 Fuel: natural gas / distillate oil Model: MS-7001EA Open cycle Efficiency: 29.38% Inlet gas temp: 1104 °C Extractor gas temp: 541 °C Stage: 3 Extract gas flow: 295.9 Nm3/min Governor: DEHG RPM: 3600 Fuel consumption NG: 19.2 kg/h Fuel consumption DO: 27.3 kL/h Compressor Type: axial flow Stage: 17 Air flow: 291.9 Nm3/min Comp rate: 12.4:1 Out pr/temp: 12.73 K / 342 °C Combustor Type: W/I R.F.C Chamber no: 10 Burner type: can/annular Pressure NG: 27.6 K Pressure DO: 46.9 K Generator Make: GE Start year: 1992 Capacity: 112,800 kVA Type: rotating field synchronous, air cooled RPM: 3600 60 Hz 2 pole 13800 V 4719 A PF/short circuit: 0.9 / 0.47 Insulation grade: F Cooling air flow: 85,799 m3/h Exciter current: 300 V / 963 A Power factor: 0.9 Cooling type: open type air cool Governor AGC oper (MW): 30~75 Dead band (%): 0.033%, 0.02 Hz Variability (MW/min): 7.95 Set point (%): 4 AGC acc rate (MW/min): 7.95 Breaker Make: GE VCB Capacity: 1500 MVA Breaking current: 37 kA Voltage: 15 kV Current: 5000 A Breaking time: 5 cycle Operating type: spring Control voltage: DC 125 V Starting Motor Type: electrical motor Capacity: 600 kW (3600 RPM, 4.16 kV) Control System Make: Emerson Type: Ovation / digital (year: 2013 modification) O/S: Windows 7 Monitoring: 1176 points Control: 396 points Spare List Rotor: 1 set 1st stage bucket: 5 sets 2nd stage bucket: 4 sets 3rd stage bucket: 4 sets 1st stage nozzle: 2 sets 2nd stage nozzle: 4 sets 3rd stage nozzle: 4 sets 1st stage shroud block: 4 sets 2nd stage shroud block: 5 sets 3rd stage shroud block: 5 sets Transition piece: 3 sets Combustion liner: 1 set Torque converter: 1 ea Gas turbine 1.2 wheel: 1 ea Journal brg: 1 ea Nozzle tip assembly: 5 ea N.G ratio valve: 181 ea Water injection pump: 1 ea Running Hours #1 G/T: 60346 hours #2 G/T: 59023 hours #3 G/T: 59162 hours #4 G/T: 56529 hours Additional Information 160 MW steam turbine generators (GE TC-2F) can be sold together with gas turbine set or can be sold separately from gas turbine sets