Cleaver Brooks, DL52-RH, 2016, 40000 lbs/hour, 260 PSI, Watertube D-Type Boiler

Description

  1. Overview
    1. March 2020 - immediately available steam plant equipment.
  2. Cleaver Brooks Boiler
    1. 40,000 lbs/hr, 260 PSI, Cleaver Brooks, model DL52-RH.
    2. Surface area: 3,430 sq ft.
    3. Skid mounted package boiler, watertube D-type design.
    4. Fuel: natural gas.
    5. Scope includes economizer, stack, duct work, steam/feedwater valves, and instrumentation.
    6. Also includes DA tank, flash tank, feedwater pumps, and updated controls, installed in 2016.
  3. Deaerator Tank
    1. 40,000 lbs/hr deaerator tank, Bryon Steam, LLC, model DST-150-40-8-0.
    2. Year 2015.
    3. National board # 6010.
    4. Includes feedwater pump, Goulds model 3355, size 1.5 x 2.5-7B.
    5. Deaerator is in very good condition.
  4. Super Heater
    1. 30,000 lbs/hr super heater, model SH6G by FSE Energy.
    2. Year 2015; unused/new surplus.
    3. Fuel: natural gas.
    4. Max operating pressure: 425 PSI; max operating temperature: 750 °F.
    5. Heat capacity: 6,000,000 BTU.
    6. Input: 30k PPH, 425 PSI steam at 437 °F; output: 30k PPH, 410 PSI, 750 °F superheated steam.
    7. Designed for use with flue gas return.
    8. Power Flame burner, model C8-G-30, natural gas.
  5. Biomass Hurst Boilers
    1. Two (2), 1500 BHP Hurst biomass boilers.
    2. 100,000+ PPH complete biomass steam boiler plant.
    3. Each: 1500 HP (51,750 lbs/hr); total steam = 103,500 lbs/hr.
    4. Rated for 150 PSI MAWP steam.
    5. Complete with ESP and modern emission controls and monitoring.
  6. Bio-Mass Gasifier / Steam Boiler System
    1. By Siemens / PrimeEnergy.
    2. Capacity: 50,000 lbs/hr saturated steam at a design pressure of 150 PSIG.
    3. Fuel consumption: 3.0 tons/hr blended waste (wood flour and shredded polyester).
    4. PrimeEnergy gasification process suitable for wood and wood waste, processed municipal solid waste (RDF), agricultural residues, paper mill sludge, wastewater treatment sludge, carpet, and more.
    5. Offered separately for this system: a 400 HP industrial shredder, Granutech-Saturn Systems model M240H.
  7. Hurst Biomass Boiler / STG
    1. 1500 HP Hurst hybrid biomass boiler with 1.0 MW Erie back pressure turbine.
    2. Boiler capacity: 51,750 lbs/hr; surface area: 9,750 sq ft; MAWP: 450 PSI; model HYD9750-450-1; year 2009.
    3. Reciprocating grate stoker design.
    4. Complete system available - DA tank through stack.
  8. Biomass Cogen - Unused
    1. 600 HP biomass cogeneration plant (unused).
    2. 1250 kW Elliott condensing steam turbine and KATO generator on steel skid.
    3. 300 PSI MAWP Johnston boiler; max: 22,000 lbs/hr.
    4. Stoker by A.R.E., model Challenger - auger feed.