Pilot Gas-To-Liquids (GTL) Plant, 3 BPD, 2013, Skid-Mounted, 1 Syngas Reactor, 4 Fischer Tropsch Reactors

Description

  1. Overview
    1. Pilot gas-to-liquids (GTL) plant
    2. Capacity of 3 bpd
    3. Immediately available
    4. Built in 2013
    5. First liquid production in 2014
  2. Specifications
    1. Includes one syngas reactor and four Fischer Tropsch (FT) reactors
    2. Syngas reactor design pressure up to 38 bar
    3. Syngas reactor design temperature up to 1400 degree c
    4. Methane flow rate up to 800 l/minute
    5. Rhodium catalyst in syngas reactor
    6. Conversion of methane to syngas 65% (commercial goal 80% with 80% selectivity to hydrogen at a h2:co ratio of 2:1)
    7. Cobalt catalyst in FT reactor
  3. Condition
    1. Equipment is skid-mounted for easy relocation and set-up