Cement and Mud Plants, 2012, 94100 cu ft Cement Storage, 31500 bbl Mud Capacity

Description

  1. Cement Plant
    1. Fully functional cement plant ready to be reassembled
    2. Original plant installed and put into service in late 2012
    3. 94,100 cu3 of storage
    4. Remained operational until 2019 when the facility was shut down due to production slowdowns in the states
    5. Now disassembled and can be professionally reassembled
    6. Process involves pneumatic transfer of cement and additives between enclosed tanks to produce specialty dry cement blends
    7. All emissions generated in the blending process are vented to the atmosphere through baghouses
  2. Cement Plant Components
    1. (4) 12500 cu ft bolted silo with 45 degree hoppers
    2. (12) DST coll assy, 30 bag, wth 22 in
    3. (12) 410 p/v scale tank
    4. (6) skid plant compr 410scflp elec
    5. (2) tk assy waste 2560cf 12 d non-p 60 in fl
    6. (16) tk assy, stg, 2560cf, 12 d, non-p w flgs
    7. (2) dust collector assy - 37 bag - c-port cm
    8. (2) dust coll and extr tn unit, sackcut, 10,000
    9. (2) blower assy, 280 icfm, 10 psig, 20 hp elec
    10. (2) compr assy, quincy, qr-25, f350, 10 hp
    11. (3) sampler, dry material, pneumatic
    12. (4) sampler, dry material, pneumatic
    13. (1) kit, pltfrms, ldrs and wlkw y, cmt plt, sa tx
    14. (1) kit, rdr lvl snsr, lvl ind&sc, cmt pt, sa tx
    15. (1) kit, pp, vlvs & cmpnts, cem plant, sa tx
    16. (1) kit, cont air vlvs & cmpnts, cmt plt, sa tx
    17. (1) kit, rlf hatches, aertn & disch, vibr, cmt p
    18. (3) kit, plc encl & elecl cmpnts, cmt plt, sa t
  3. Mud Plant
    1. Functional liquid mud plant (LMP) 31,500 bbl capacity
    2. Original LMP installed and put into service in late 2012
    3. Remained operational until 2019 when the facility was shut down due to production slowdowns in the states
    4. Plant now disassembled and ready to be professionally reassembled
  4. Mud Plant Components
    1. Existing bolted tanks with new hardware and sealant
    2. (3) newly purchased 4125 cu. ft. pressure vessels
    3. New mix pit canopy
    4. (3) 2000 bbl bolted tanks
    5. (17) 1500 bbl bolted tanks
    6. (3) 500 bbl bolted mix tanks
    7. (1) 250 bbl HDPE poly tank CC
    8. (1) 250 bbl HDPE poly tank H2O
    9. (4) 4124 cu ft pressure vessel
    10. (4) load cells
    11. (3) barite injectors
    12. (1) mud strainer
    13. (3) vortex shear mixers
    14. (1) stand for shear mixers
    15. (1) dust collector pressure
    16. (1) compressor
    17. (6) pumps 8x6x14
    18. (2) pumps 4x3x14 H2O
    19. (21) radars w/ high level alarm
    20. (3) flow meter
    21. (1) shaker
    22. (1) centrifuge
    23. (1) shaker/centrifuge stand
    24. (21) piping for storage & mix tank
    25. (2) piping for HDPE tanks
    26. (4) piping for barite & comp.
    27. (1) cover over mixing area (3280 ft.)
    28. (1) control room/lab
    29. (1) design of LMP 3D modeling
    30. (1) safety equipment
    31. (1) MCC/cabling/lights/electrical
    32. (1) labor
    33. (1) piping - 2000 bbl
    34. (1) automation
    35. (3) radars - mix pits
    36. (9) actuators
    37. (1) project management
    38. (23) new reset hardware for all tanks
    39. (15) shipping containers