General Electric, LM2500, 1992, 22MW, Dual Fuel Gas Turbine Core

Description

  1. Overview
    1. Two ge lm2500 sac complete power plants and boilers
    2. Simple cycle, two shaft turbine
    3. Original construction 1992
    4. Last overhaul 2022
    5. Variable geometry in the compressor
    6. Annular combustor
    7. Air-cooled turbine blades and vanes
    8. Power turbine designed for high efficiency over a wide output power range
    9. Modular construction simplifies field repair and replacement
    10. 16-stage axial-flow compressor capable of reaching 18:1 pressure ratio
    11. Inlet guide vanes and adjustable stator vanes on the first six compressor stages
    12. Manufactured with corrosion resistant coatings to extend hot section life
  2. Power Plants Specifications
    1. Quantity: 2 x ge lm2500 sac
    2. Power capacity: 22 mw each
    3. Overhaul: both plants were overhauled with new hot sections
    4. One unit has only 600 hours
    5. Second unit has 6000 hours
    6. Maintenance: low hours since new hot section exchanges and new tmf in 2022
  3. Details
    1. Lm2500
    2. Single shank
    3. 22 mw
    4. Dual fuel (natural gas and diesel)
    5. Turbine mid frame, generation 2
    6. Only 5000 hours since overhauled / excellent borescope
    7. Overhauled and new hot sections
    8. New tmf in 2022
    9. Decommissioned currently for export
    10. Can be shipped immediately
  4. Engine Serial Numbers
    1. Esn: 481-415 – approximately 600 hours since hot section exchange and major inspection in 2022
    2. Esn: 481-758 – approximately 6000 hours since last overhaul, hot section exchange, and major inspection in 2022
  5. Scope Of Supply
    1. Power output (iso): 22.34 kw
    2. Fuel type: liquid and gas fuels (dual firing)
    3. Hours: 600 unit 1, and 6000 unit 2 – since last major inspection and hot section change
    4. Borescopes available
  6. Condition
    1. Condition is fair
    2. Will need some rebuilding