GE, TM2500+ Gen 6, 2015, 30.3 MW, 50/60 Hz, Dual Fuel Mobile Gas Turbine Generator Set
Scroll to zoom
100%
Description
Condition
Lightly used
Scope Of Supply
Main trailer consisting of the following components
Main Trailer And Jeep
A seven-axle, air ride suspension trailer (3+4) and a 3-axle jeep are used to transport the main trailer components
The trailer and jeep combination is approximately 108' (32.9 m) long (less tractor) during transport and weighs approximately 210,000 pounds (95,254 kg) fully loaded
Ten landing legs are provided to support and level the equipment at the jobsite
Gas Turbine
The gas turbine is a General Electric LM2500 PKMDW model ISO rated for continuous duty and configured for operation on either natural gas or liquid fuel
Each is configured for optional water injection for nox reduction, if required
The engine is shock mounted for shipping and shipped in position, with the exception of the coupling spacer, which is installed during commissioning
Fuel System
Dual fuel configuration
Natural gas fuel system using an electronically controlled fuel metering valve
For full-load operation, the gaseous fuel must be supplied to the auxiliary trailer skid connection at: 320 mmbtu/hr max; 180 °f [82 °c]; max; 520 +/- 20 psig (3,585 +/- 138 kpag); and filtered to 5 or less microns
Liquid fuel system
Typical liquid fuels include df1, df2, or jp4
For full-load operation, buyer must supply liquid fuel to the connection at the auxiliary trailer skid at 40 gpm (151.4 l/min], 30 ± 10 psig (207 ± 69 kpag], filtered to 5 microns and at least 20°f (11°c) above the wax point temperature
All necessary shutoff valves, flow meter, piping and instruments between the auxiliary trailer skid connection and the engine are included
Buyer must provide supply piping with sampling ports, fuel system filtration and applicable shut-off valves and containment per local codes and standards
Water injection system capable of water injection for nox reduction
For full-load operation, the demineralized water must be supplied to the auxiliary trailer skid connection at 28 gpm (106 l/min], 15 psig (103 kpag] minimum, 40 to 140 °f (4 to 60 °c) filtered to 10 microns
The buyer must provide demineralized water that is clean, filtered and compliant with General Electric specification mid-td-0000-3
Switchgear
Supplied with a 3 section NEMA 3R switchgear enclosure, including a set of generator circuit breaker equipment, 2 sets of incoming line voltage monitoring equipment, a marshaling cabinet and a set of switchgear accessories
Permanent cable terminations from the neutral and line-side of the generator are also included
Auxiliary Trailer Skid
The auxiliary trailer skid includes fuel and water injection system components not mounted on the main trailer
The pumps, filters and necessary instrumentation are connected to the main trailer components at site with interconnect hoses
The auxiliary trailer skid also includes the hydraulic start system and water wash system described below
Electro-Hydraulic Start System
Supplied with a hydraulic starting system, which includes an electric motor driven hydraulic pump assembly, filters, and a fin/fan heat exchanger mounted on the auxiliary equipment module
A hydraulic motor is also mounted on the gas turbine accessory gearbox to turn the gas generator shaft
All piping and fittings on the base plates, plus hydraulic connections between the auxiliary equipment module and the main base plate are also furnished
"Off Line" Soak Wash System
An "off-line" cleaning system, with a water wash reservoir and all necessary filters and instrumentation supplied
Fire Protection System
Installed fire protection system complete with hydrocarbon sensing and thermal detectors, piping and nozzles in the engine compartment
The fire protection system includes cylinders containing co2 mounted on the auxiliary trailer
An included 24 vdc battery and charger powers the fire protection system (located in the control house)
All alarms and shutdowns are annunciated at the unit control panel
An alarm sounds at the turbine if the gas detectors detect high gas levels, or if the system is preparing to release the co2
When activated, the package shuts down, and the primary co2 cylinder is discharged into the turbine compartment via multiple nozzles, and the ventilation dampers automatically close
After a time delay and if required, the reserve supply of co2 is discharged
Fin Fan Cooler
A 100% redundant dual fan, single core cooler with separate coils for the turbine, generator lube oil and hydraulic oil
The cooler is equipped with all interconnect piping and instrumentation necessary for the three circuits
Control House
The basic equipment package is supplied with a lighted, insulated 22' (6.7 m) long by 8'-6" (2.6 m) wide control house
The control house is equipped with an access door, air conditioner/heater, and a hand held fire extinguisher
The control house is used to package the equipment listed below
Digital Control System
The control system features an integrated electronic fuel management system with a programmable sequencer, vibration monitor, fire system monitor, digital meter, and a digital generator protective relay module
A desktop or laptop pc with separate workstation and chair is provided for hmi control
Alarm and shutdown events are displayed on the hmi automatically
A dedicated 24v dc battery system with power charger is included in the control house
Generator Protective Relays
The equipment package is supplied with two (2) integrated generator protection system (igps) microprocessor-based relay modules, mounted in the turbine control panel
One igps is configured for 50hz and one igps is configured for 60hz
The appropriate igps will be selected for use at site
The igps includes all functions necessary for protection of the generator
Unit Motor Control Center
A freestanding lineup of motor controls for all tm2500+ package motors is supplied
The motor control center is installed in the control house and also includes a 45 kva lighting and distribution transformer
Battery And Charger System
The equipment package is supplied with a 24 vdc nicad battery system for control power and fire system and charger for each
In addition, a 125 vdc nicad battery system with charger is supplied for the generator lube pump
The 125vdc battery charger has a selector switch to receive power from either the mcc or an external generator to charge the batteries
The battery systems are fully wired and mounted in racks and are installed in the control house along with the wall-mounted chargers
Gas Turbine Air Filter Assembly
The air filter is approximately 27' (8.2 m) long and 10'-11" (3.33 m) wide and weighs approximately 20,000 pounds (9072 kg) fully loaded
The air filter is equipped with a two-stage filtration system for both ventilation and combustion air with panel type pre-filters housed in hinged doors and high efficiency
Specifications
Hours: Under 3,000
Request a Quote
✓
Request sent
Thank you, our team will reply to you shortly.
Direct access to our team
Email American Plant & Equipment
Tell us what you want to buy, source, finance, or sell. A machinery specialist will follow up with you.
✓
Thank you. Your request is with the American Plant and Equipment team.
A machinery specialist will follow up with you.
Machinery updates
Subscribe to our email list
Tell us which industries you follow and we will send you the machines that match.
✓
You are on the list.
We will email you when machines that match your interests come in. Unsubscribe from any message.