Description Overview Hrsg boiler with supplementary burner Generator 10.5 kv, 50 hz, year: 2007, fuel natural gas (ng) Hours run since overhaul 12000 hours Borescope performed in 2016 Plant has been well maintained and is a complete package Specifications Manufacture: ge model: lm2500 sac power output: 31 mw Fuel: natural gas (ng) Voltage: 10.5 kv frequency: 50 hz Turbine year of manufacture: 2007 Total running hours: 23,859 hours. Total number of starts: 1428 Operational hours run since major overhaul: 12,500 Last run 2020 Maintenance: borescope performed in 2018 under long term maintenance contract Boiler: 56 bar hrsg boiler with supplementary burner Scope Of Supply 31 mw lm2500 gas turbine power plant Turbine and accessories Turbine scada system master pc turbine scada client pc Turbine control system Turbine control room turbine fire detection system turbine package Turbine ventilation system Turbine fire exhaustion system (10 x c02 tube) turbine vibration system Turbine hydraulic start system Ventilation fans (2 units) generator ventilation fans (2 units) 10.5 kv generator Generator cabin Generator lubrication unit All control cabinets Turbine operation and maintenance manual (2 sets) Water injection system Utility transformer 1250 kva - 34.5/0.4 kv Hrsg system package Included Components Transformers Electrical systems Control systems Cooling systems Starting system Lubricating system Pumps Fire fighting system