GE, Frame 6B, 2009, 80MW Cogeneration Power Plant, Natural Gas, 2x 40MW Gas Turbine Generators

Description

  1. Overview
    1. Cogeneration power plant
    2. 80 mw total capacity
    3. Two ge frame 6b gas turbine generators, 40 mw each
    4. Natural gas fueled
    5. New year 2009
  2. Heat Recovery Steam Generators
    1. Two nem heat recovery steam generator systems
    2. Rated at 67 bar @ 45°c or 970 psig @ 84°f
    3. Complete with valves, pumps, sensors, and additional infrastructure
  3. Maintenance History
    1. Overhaul 1: tg4801 in 06/2016; tg4851 in 09/2015; total firing hours 25,000
    2. Overhaul 2: tg4801 in 05/2019; tg4851 in 09/2018; total firing hours 50,000
    3. Overhaul 3: tg4801 not applicable; tg4851 in 09/2021; total firing hours 75,000
  4. Condition
    1. Used