First set of gas-steam combined cycle generating units (#1 gas turbine, #2 boiler and #2 steam turbine) was put into commercial operation on November 9, 2004 (burning heavy oil)
Converted from oil to gas in January 2010
LNG natural gas power generation operation completed in November 2010
CNOOC pipeline natural gas connected in July 2014
In April 2015, the #1 gas turbine underwent DLN transformation
Unit 2 History
Second set of gas-steam combined cycle generating units (#3 gas turbine, #4 boiler and #4 steam turbine) was put into commercial operation on December 6, 2004 (burning heavy oil)
Converted from oil to gas in January 2010
LNG natural gas power generation operation completed in November 2010
CNOOC pipeline natural gas connected in July 2014
In May 2014, the #3 gas turbine completed the DLN transformation work
Turbine/boiler control system DCS is the INFI90 system of Bailey Company (ABB)
Has a ring topology and consists of three loop systems: the first set of combined cycle, the second set of combined cycle and public system composition
Public Systems
Water treatment equipment
Cooling water equipment (pump sets, oil coolers, generators)
Compressed air equipment
DC power supply equipment
Electronic room equipment
Switch room equipment
Specifications
Capacity: 180MW
Rotation speed: 3000RPM
Gas turbine model: MS-9001E (PG9171E)
Generator capacity: 170MVA
Request a Quote
✓
Request sent
Thank you, our team will reply to you shortly.
Direct access to our team
Email American Plant & Equipment
Tell us what you want to buy, source, finance, or sell. A machinery specialist will follow up with you.
✓
Thank you. Your request is with the American Plant and Equipment team.
A machinery specialist will follow up with you.
Machinery updates
Subscribe to our email list
Tell us which industries you follow and we will send you the machines that match.
✓
You are on the list.
We will email you when machines that match your interests come in. Unsubscribe from any message.