Description Overview Mitsubishi steam turbine power plant Coal fired steam turbine power plant 147 MW rated output Year of manufacture: 1999 Total operation hours: 179,007 hours for the entire plant from 1999 to March 2024 Operation time since last overhaul: 44,610 hours (generator) Generator replacement date: May 6, 2018 Specifications Rated output: 147,000 kW, 6,600 kV, 3 phase, 60 Hz Number of revolutions: 3,600 rpm Main steam stop valve inlet pressure: 16.57 MPa Main steam stop valve inlet temperature: 566 °C Reheat steam stop valve inlet pressure: 2.98 MPa Reheat steam stop valve inlet temperature: 538 °C Exhaust pressure: -0.0959 MPa Condition Kept in excellent condition Procedures are in progress to sell the entire plant equipment in mid-2025 Was still in production which was canceled and will be dismantled after negotiation and positive inspection