Tetra Pak, TBA21/500 SQ, 2003 to 2019, Complete Filling Lines, Package of 2 Lines

Description

  1. Overview

    1. Two complete Tetra Pak packaging lines, out of production since April 2024 and still fully installed in the factory.

    2. Remaining caps, wrap cartons and spare parts are included.

  2. Line 1

    1. Filler: Tetra Pak, type TBA21/500 SQ, V50, year 2004, operating hours 29,478 h, includes Videojet 1630 (year 2019).

    2. Applicator: Tetra Pak, type TCAP45, year 2004, operating hours 27,739 h, includes Nordson Problue 4 glueing device.

    3. Packer: Tetra Pak, type TCP70, year 2004, operating hours 34,819 h, includes Nordson Problue 10 glueing device.

    4. Conveying belts: Tetra Pak Easy Ride, approximately 65 m.

  3. Line 2

    1. Filler: Tetra Pak, type TBA21/500 SQ, V50, year 2003, operating hours 31,128 h, includes Videojet 1630 (year 2016).

    2. Applicator: Tetra Pak, type TCAP45, year 2003, operating hours 30,881 h, includes Nordson Problue 4 glueing device.

    3. Packer: Tetra Pak, type TCP70, year 2003, operating hours 31,528 h, includes Nordson Problue 10 glueing device.

    4. Conveying belts: Tetra Pak Easy Ride, approximately 65 m.

  4. Condition

    1. Both lines are out of production since April 2024 and still complete and installed in the factory.

  5. Included

    1. Remaining caps, wrap cartons and spare parts.