GE, 9FA, 2011, 750MW, 50Hz, CCGT Power Plant

Description

  1. Overview
    1. Ge 9fa ccgt plant
    2. Unused
    3. Year of commission: 2011
    4. 2 x unused, installed ccgt package
  2. Gas Turbine Package
    1. 4 x gas fuel, 241mw, 50hz, ge 9fa +e dln2+ package
    2. 4 x 241mw ge 9fa +e dln2+ package
  3. Transformers
    1. 335mva 15.75kv hyundai transformers
  4. Heat Recovery Steam Generators
    1. 4 x cmi triple pressure hrsg
  5. Steam Turbine
    1. 2 x ge d-11 276mw steam turbine (uninstalled and packaged)
  6. Additional Equipment
    1. Black start diesel generators
    2. Turbine acoustic enclosures
    3. Mark vie control system
  7. Specifications
    1. Capacity: 750MW