Tetra Pak, TBA21/500 SQ, 2003-2004, Complete Filling Lines, 2 Lines, TBA21/500 SQ V50 Filler, TCAP45 Applicator, TCP70 Packer

Description

  1. Overview

    1. Two complete Tetra Pak filling lines, out of production since April 2024 and still fully installed in the factory.

  2. Line 1

    1. Filler: Tetra Pak, type TBA21/500 SQ, V50, year 2004, operating hours 29,478 h.

    2. Includes Videojet 1630, year 2019.

    3. Applicator: Tetra Pak, type TCAP45, year 2004, operating hours 27,739 h.

    4. Includes glueing device Nordson Problue 4.

    5. Packer: Tetra Pak, type TCP70, year 2004, operating hours 34,819 h.

    6. Includes glueing device Nordson Problue 10.

    7. Conveying belts: Tetra Pak Easy Ride, approximately 65 m.

  3. Line 2

    1. Filler: Tetra Pak, type TBA21/500 SQ, V50, year 2003, operating hours 31,128 h.

    2. Includes Videojet 1630, year 2016.

    3. Applicator: Tetra Pak, type TCAP45, year 2003, operating hours 30,881 h.

    4. Includes glueing device Nordson Problue 4.

    5. Packer: Tetra Pak, type TCP70, year 2003, operating hours 31,528 h.

    6. Includes glueing device Nordson Problue 10.

    7. Conveying belts: Tetra Pak Easy Ride, approximately 65 m.

  4. Condition

    1. Both lines are out of production since April 2024 and still complete and installed in the factory.

  5. Specifications

    1. Delivery conditions: Dismantled and loaded in container