Description Overview Caterpillar D8T waste handler Rebuilt / reconditioned Year 2014 Machine frame hours: 10,375 Approximately 400 hours since rebuild All needed servicing and repairs have been completed Optional MS ripper is available Rebuild / repair report Service History Servicing Caterpillar dealer fully maintained every 250, 500, 1,000 and 2,000 hour services since new At 9,772 hours Caterpillar dealer rebuilt transmission At 9,772 hours Caterpillar dealer rebuilt torque converter At 10,174 hours Caterpillar dealer installed reman engine At 10,174 hours Caterpillar dealer installed new engine mounts At 10,174 hours Caterpillar dealer installed Caterpillar reman transmission cooler At 10,174 hours Caterpillar dealer installed Caterpillar reman engine oil cooler At 10,174 hours Caterpillar dealer installed Caterpillar reman turbo At 10,174 hours Caterpillar dealer installed new NRS cooler At 10,174 hours Caterpillar dealer dyno tested engine At 10,174 hours Caterpillar dealer rebuilt emission system At 10,174 hours Caterpillar dealer rebuilt both final drives At 10,174 hours Caterpillar dealer rebuilt diff steering and brake assemblies At 10,174 hours Caterpillar dealer rebuilt implement pump At 10,174 hours Caterpillar dealer rebuilt steering pump At 10,174 hours Caterpillar dealer rebuilt diff steering motor At 10,174 hours Caterpillar dealer installed Caterpillar reman fan motor At 10,174 hours Caterpillar dealer rebuilt hydraulic fan pump At 10,174 hours Caterpillar dealer installed new fuse block At 10,174 hours Caterpillar dealer installed new hardnose pins and bushings Repairs Completed at 10,375 Hours Removed ripper assembly and installed dog house / striker bar Rebuilt seat suspension assembly Installed new pivot shaft oil bottle Installed new pilot accumulator Serviced and cleaned cab pre-cleaner Serviced and cleaned HVAC system Replaced any required hoses / lines Installed all new Caterpillar undercarriage Inspected all bogie joints Resealed transmission manifold Installed new torque converter output seal Installed new driveshaft u-joints Resealed engine oil pan Installed new transmission sensor Inspected all pulleys Serviced electrical box Completed required cab repairs Rebuilt and resealed transmission pump Installed new hardbar pads Resealed left lift cylinder Serviced A/C system Installed new A/C condenser mounts Completed required blade repairs Replaced blade pins / bushings as needed Line bored blade pin bores as needed Assembled blade and installed Completed miscellaneous repairs Completed required welding / cosmetic repairs Complete machine was sandblasted, primed, painted and new decals applied Condition Machine is work ready