Siemens, SGT 600, 2011, 25 MW, 10.5 kV, 50 Hz, Dual Fuel Gas Turbine

Description

  1. Overview
    1. Siemens SGT 600 turbine
    2. Dual fuel (natural gas, diesel oil)
    3. Dual shafts (may drive for compressor)
    4. Year 2011
    5. Working hours: 553
    6. Number of starts: 52
    7. Total service time: 374
    8. Equivalent operating cycles: 58
  2. Specifications
    1. 25 MW
    2. 10.5 kV
    3. 50 Hz
    4. Dle
  3. Components
    1. High pressure compressor
    2. Combustor
    3. High pressure pt
    4. Pt
    5. Gearbox (voith)
    6. Alternator (abb)
    7. Gas control part
    8. Control room
    9. Recovery heat boiler
    10. Original manual book
    11. Chimney
    12. Transformer
    13. Dryer
    14. Fans
    15. Air conditioner
    16. Control boxes
    17. Control computer
    18. Cables
    19. Lube system
  4. Maintenance Record
    1. The maintenance mainly involves passing hot air from the dryer to the combustion chamber. We have previously tried turning the dryer. Desiccant is placed inside the steam drum of the waste heat boiler.
    2. The last run was in December 2017, and it was started every three months for about a year. Finally, we communicated with Siemens to adopt a long-term maintenance method, so we did not attempt to ignite again.
  5. Delivery
    1. Immediate delivery