Siemens, SGT 800, 2008, 50 Hz, 50 MW, Gas Turbines

Description

  1. Overview
    1. Siemens Sgt 800 gas turbines
    2. With spare parts
    3. Year: 2008
    4. Working hours: total is 98k and 110k
    5. Overhauling year: 2019
    6. Turbines were stopped in February / March 2022, then they were immediately dismantled and packed by Siemens and us.
  2. Upgrades
    1. Both turbines were delivered originally as a type with guaranteed 45 mw capacity.
    2. One of the turbines was in 2010 upgraded to a+ type with guaranteed 47.5 mw (incl. new rotor).
    3. The maximum capacity of both turbines is 52 mw and is electronically limited to 50 mw.
    4. Siemens certificate for warranty 50 mwe can be presented to end customer after signing confidentiality agreement.
  3. Gear
    1. Both gear were generally revised in 2018 and have low running low hours after revision since now. Regarding to service they are like new condition.
  4. Generator
    1. This is almost inspection free Siemens generator 11 kv 50 hz.
  5. Spare Parts
    1. Turbines a set of over 1600 spare parts, including important critical spare parts like blades and vanes, bearings, innerring, burning chamber and others.
  6. Condition
    1. Perfect condition.