GE, TM2500, 2001, 22MW, 60Hz, Mobile Gas Turbine Generator Set

Description

  1. Overview
    1. GE TM2500 22MW EA
    2. 60 Hz
    3. Year 2001 refurbished
    4. For immediate delivery
  2. Operating Hours
    1. Life time hours: 14,500 and 43,600
    2. Hours since overhaul: original and 23,000
    3. Time since new pt: 0.6k to 7,600
    4. Time since last hpt: 14k
  3. Scope of Work
    1. Woodward valve exchanged
    2. Pumps redone by Hidra Quip
    3. Switchgear redone ct pt and breakers all passed
    4. Generators were removed and reconditioned
    5. Repainting control room, exhaust and intake
    6. Batteries were replaced with new dry type
    7. Fire system rebuilt
    8. Voltage regulator re-certification
    9. Flush systems
    10. New oil and hydraulic fluids
    11. Air filtration changed
    12. Align turbine and generator
    13. New hmi
    14. Human interface for site remote capability
    15. Certification of trailer (all rewired brakes, air bags, and bearings)
    16. Run test