Description Specifications Power turbine speed: 7759 rpm Working hours: 553 Number of starts: 52 times Total service time: 374 Equivalent operating cycles: 58 Shafts: Dual ShaftsFuel type: Dual (Natural Gas)Emission type: DLE (Dry Low Emission)Alternator speed rpm: 1500 Scope Of Supply High pressure compressor Combustor High pressure PT PT Gearbox (Voith) Alternator (ABB) Gas control part Control room Recovery heat boiler Original manual book Chimney Transformer Dryer Fans Air conditioner Control boxes Control computer Cable Lube system Some new spare parts Maintenance Record The maintenance mainly involves passing hot air from the dryer to the combustion chamber. We have previously tried turning the dryer. Desiccant is placed inside the steam drum of the waste heat boiler. The last run was in December 2017, and it was started every three months for about a year. Finally, we communicated with Siemens to adopt a long-term maintenance method, so we did not attempt to ignite again.